Safe Site Matting: Talk the talk and walk the walk

Another great site visit to see our Chapter 8 Barriers and over 500m of Safe Site Matting put into action, providing safe demarcation and effective pedestrian access.

The contractor had to remove an existing footpath whilst roadworks were carried out over a 4 month period, whilst this was done a temporary footpath was created using our Safe Site Matting.

Safe Site Matting is a unique heavy duty rubber system designed with a simple tongue and grove connection edges, this means each 1.2m x 0.8m section can be simply and easily installed by a single person on site without the need for any specialist equipment.

case-study-safe-site-matting-talk-the-talk-and-walk-the-walk-chapter-8-barriers

The connection design also creates a complete footpath with a neat and smooth finish removing any trip hazards.