What was the project?
Harmonix Construction installed a 1,000m² temporary car park in Eastways, Witham, Essex, ensuring ground protection during an eight-week project. The carefully planned installation provided a stable surface for vehicles and equipment while minimising disruption.
Our solution, Safe Site Matting
We provided Harmonix Construction with additional mats than first expected, totalling 1,200+ Safe Site Matting, still ensuring quick installation from the tongue-and-groove connection – the choice for durability and support of vehicles on their site.

Result for Harmonix Construction!
The temporary car park was installed efficiently during one day and was a suitable budget option during the construction project.
“Different thicknesses of Safe Site Matting were used for varying ground conditions, and additional mats were available as needed.”
Elite Sales team member
A cleaning service ensured optimal performance throughout and the mats are good for reuse after the hire period.